FM 546 / CR 400 Corridor Study – Phase I East

The Farm-to-Market (FM) 546/County Road (CR) 400 project is an alignment study for a six-lane major thoroughfare from the intersection of Airport Drive and FM 546 in McKinney, Texas, to U.S. 380 at Boorman Lane in Princeton, Texas. The corridor was established in the 2014 Update of the Collin County Mobility Plan as part of improving future mobility across central Collin County. The study was divided into two parts because the work required in the segments is substantially different, with the eastern segment having much of the alignment already set. The eastern segment (Phase I) spans across City of Lowry Crossing and City Princeton city limits and ETJs, from Bridgefarmer Road to U.S. 380. FM 546/CR 400 Corridor Study – Phase I East has been conducted in collaboration with City of Lowry Crossing and City of Princeton. The preferred alignment for the eastern segment was approved at a regular session of the Collin County Commissioners Court on June 7, 2021 in McKinney, Texas. 

The western segment (FM 546 Extension Phase II) is located within the City of McKinney and City of Lowry Crossing city limits and ETJ. The western segment’s (Phase II) project limits are from Airport Drive to CR 393 and is a partnership between Collin County and the Texas Department of Transportation (TxDOT). For more information on the western segment, please visit   FM 546 Extension Phase II.

This website was created as means to keep interested parties aware of the progress of the project. To reach out to the team or receive project updates via email, click on “Learn More” tab.



Project Updates

Please click  here to view the latest design schematic, updated November 2022. 

  • Right of Way document preparation and acquisition process is ongoing.
  • Construction plans began Spring 2023.


Public Hearing

The Collin County Commissioners Court conducted a public hearing regarding the proposed preferred alignment for the FM 546/CR 400 east corridor study at a regular session of the Collin County Commissioners Court on June 7, 2021 at 1:30 P.M. in the Commissioners Courtroom in McKinney, Texas. This public hearing was provided to allow interested parties to address the proposed preferred alignment. A preferred alignment was selected during that hearing.


Please click the Past Public Meetings tab to view recent public meeting materials.


FM 546 / CR 400 Project 3D Fly-Through Visualization

Typical Sections

 Typical selects of the interim and ultimate phases are shown in the figures below.

Virtual Public Meeting #1

A virtual public meeting was conducted on Thursday, October 29, 2020. The comment period for that public meeting closed on Friday, November 13, 2020. Recorded virtual public meeting, notice, script, and handout are below.


Virtual Public Meeting #2

A virtual public meeting was conducted on Thursday, March 25, 2021. The comment period ended on Friday, April 9, 2021. The prerecorded virtual public meeting, notice, script, and recommended alternative layouts are below.


Public Hearing

The Collin County Commissioners Court conducted a public hearing regarding the proposed preferred alignment for the FM 546/CR 400 east corridor study at a regular session of the Collin County Commissioners Court on June 7, 2021 at 1:30 P.M. in the Commissioners Courtroom in McKinney, Texas. This public hearing was provided to allow interested parties to address the proposed preferred alignment. A preferred alignment was selected during that hearing. A copy of the presentation is located here

Be In The Know

If you would like to receive updates regarding the FM 546 / CR 400 Phase I project, please provide your contact information below.